April let me start
In April 10-th, when the soil finally softened I resumed construction. The first thing I needed was a connection to the waterworks. The house reqired also connection to the sewage system. Plastic pipes had to be layed down before and under the concrete layer of surface level. In several days from now walls will start to grow. I almost forgot to mention about the electricity, but this is a must at the construction site.