11 January 2006

Kingdom for a sand!

December 12-th and 13-th.

I had no idea how much sand I need to fill in the foundation.
The large pile of soil extracted previously was not enough.
I took 9 loads of dumper to finish the work (180 tons).
I was on the building site then and these busy, noisy and cold two days there were kind of romantic experience. ;)





No comments:

Add to Technorati Favorites